2.5 KiB
2.5 KiB
Specification Quality Checklist: Unified Workflow Engine — Production Hardening & Integrated Context
Purpose: Validate specification completeness and quality before proceeding to planning Created: 2026-05-02 Feature: spec.md
Content Quality
- [~] No implementation details (languages, frameworks, APIs) — Note: Technology-specific terms (Redis, BullMQ, ClamAV, JSON Logic) are present in FRs as ADR-mandated architectural constraints (ADR-001/ADR-008/ADR-016), not spec-level implementation choices. Consistent with existing
001-transmittals-circulation/spec.mdpattern. - Focused on user value and business needs
- [~] Written for non-technical stakeholders — Note: Platform/infrastructure feature; technical Functional Requirements (FR-001 to FR-021) intentionally use ADR terminology. User Stories (P1-P3) and Success Criteria are non-technical.
- All mandatory sections completed
Requirement Completeness
- No [NEEDS CLARIFICATION] markers remain
- Requirements are testable and unambiguous
- Success criteria are measurable
- Success criteria are technology-agnostic (no implementation details)
- All acceptance scenarios are defined
- Edge cases are identified
- Scope is clearly bounded
- Dependencies and assumptions identified
Feature Readiness
- All functional requirements have clear acceptance criteria
- User scenarios cover primary flows
- Feature meets measurable outcomes defined in Success Criteria
- No implementation details leak into specification
Notes
- Spec derived from ADR-001 (Unified Workflow Engine v1.1 — 2026-05-02 production hardening) and ADR-021 (Integrated Workflow Context & Step-specific Attachments)
- Clarification session 2026-05-02 (5/5 questions resolved):
- Q1: DSL
require.role→ CASL ability check (FR-002a) - Q2: Observability = structured log + metrics (FR-022, FR-023, SC-009)
- Q3: File rollback on DB failure = move back to temp, 24h TTL (FR-019)
- Q4: Admin UI for DSL authoring is IN scope (FR-024, FR-025)
- Q5: All 4 modules (RFA/Transmittal/Circulation/Correspondence) need banner gap-filling (FR-011, Assumptions updated)
- Q1: DSL
- ADR-001 clarifications fully captured in FR-001 through FR-010 and SC-001 through SC-005
- ADR-021 requirements (REQ-01 to REQ-06) fully captured in FR-011 through FR-025 and SC-006 through SC-009
- Visual workflow builder (drag-and-drop DSL editor) is explicitly out of scope (Phase 2)