Files
lcbp3/specs/06-tasks/frontend-progress-report.md
admin d964546c8d
Some checks failed
Spec Validation / validate-markdown (push) Has been cancelled
Spec Validation / validate-diagrams (push) Has been cancelled
Spec Validation / check-todos (push) Has been cancelled
251212:1650 Frontend: refactor Document Numbering)
2025-12-12 16:50:52 +07:00

4.1 KiB

Frontend Progress Report

Date: 2025-12-12 Status: Complete (~100%)

📊 Overview

Task ID Title Status Completion % Notes
TASK-FE-001 Frontend Setup Done 100% Project structure, Tailwind, Shadcn/UI initialized.
TASK-FE-002 Auth UI Done 100% Store, RBAC, Login UI, Refresh Token, Session Sync implemented.
TASK-FE-003 Layout & Navigation Done 100% Sidebar, Header, Layouts are implemented.
TASK-FE-004 Correspondence UI Done 100% Form enhanced with Project/Type/Discipline dropdowns (2025-12-12).
TASK-FE-005 Common Components Done 100% Data tables, File upload, etc. implemented.
TASK-FE-006 RFA UI Done 100% Integrated with Backend (Workflow/Create/List).
TASK-FE-007 Drawing UI Done 100% Drawings List & Upload integrated with Real API (Contract/Shop).
TASK-FE-008 Search UI Done 100% Global Search & Advanced Search with Real API.
TASK-FE-009 Dashboard & Notifications Done 100% Statistics, Activity Feed, and Notifications integrated.
TASK-FE-010 Admin Panel Done 100% Users (UX: Skeleton/Dialogs), Audit Logs, Orgs (UX refactor).
TASK-FE-011 Workflow Config UI Done 100% List/Create/Edit pages, DSL Editor, Visual Builder implemented.
TASK-FE-012 Numbering Config UI Done 100% Template Editor, Tester, Sequence Viewer integrated.
TASK-FE-013 Circulation & Transmittal Done 100% Circulation and Transmittal modules implemented with DataTable.
TASK-FE-014 Reference Data UI Done 100% Generic CRUD Table refactored (Skeleton/Dialogs). All pages linked.
TASK-FE-015 Security Admin UI Done 100% RBAC Matrix, Roles, Active Sessions, System Logs implemented.

🛠 Detailed Status by Component

1. Foundation ( Completed)

  • Tech Stack: Next.js 14 (App Router), TypeScript, Tailwind CSS, Shadcn/UI.
  • Structure: app/, components/, lib/, types/ structured correctly.
  • Layout: Responsive Dashboard layout with collapsible sidebar and mobile drawer.

2. Authentication (TASK-FE-002) ( Completed)

  • Implemented:
    • Login Page with Shadcn/UI & Toast Notifications.
    • auth-store (Zustand) for client-side state & permission logic.
    • <Can /> Component for granular RBAC.
    • AuthSync to synchronize NextAuth session with Zustand store.
    • Type definitions updated for username mapping.
  • Pending (Backend/Integration):
    • Backend needs to map assignments to flatten role field for simpler consumption (currently defaults to "User").

3. Business Modules ( Completed)

  • Correspondences: Form enhanced with Project/Type/Discipline dropdowns. organizationCode column fix. Document numbering {RECIPIENT} token fix (2025-12-12).
  • RFAs: List and Form UI components integrated.
  • Drawings: List and Upload integrated.
  • Integration: All modules using tanstack-query and aligned with Backend DTOs.

📅 Next Priorities

  1. End-to-End Testing & UAT: Perform comprehensive testing of all modules and user journeys.
  2. Performance Optimization: Load testing and optimization for production workloads.
  3. Production Deployment: Final environment configuration and deployment preparation.
  4. User Training & Documentation: Prepare user guides and training materials.