13 KiB
Tasks: Typhoon OCR Integration
Input: Design documents from /specs/200-fullstacks/232-typhoon-ocr-integration/
Prerequisites: plan.md, spec.md, research.md, data-model.md
Tests: Tests are NOT included in this task list as they were not explicitly requested in the feature specification.
Organization: Tasks are grouped by user story to enable independent implementation and testing of each story.
Format: [ID] [P?] [Story] Description
- [P]: Can run in parallel (different files, no dependencies)
- [Story]: Which user story this task belongs to (e.g., US1, US2, US3)
- Include exact file paths in descriptions
Path Conventions
- Backend:
backend/src/ - Frontend:
frontend/src/ - Infrastructure:
specs/04-Infrastructure-OPS/ - ADRs:
specs/06-Decision-Records/
Implementation Reality Notes (2026-05-30)
- Repo reality differs from this task list in several places, especially frontend paths (
frontend/app,frontend/components,frontend/lib) and the OCR sandbox integration seam. - Completed work is checked only where the task intent materially matches the implemented result.
- Equivalent implementation completed outside the exact stale path/task wording:
- US1 sandbox OCR engine selection was implemented via
backend/src/modules/ai/services/sandbox-ocr-engine.service.tsand existing sandbox UI/component wiring instead of adding new DTO/entity files and modifyingocr.service.tsdirectly. - US2 partial groundwork was completed by seeding
typhoon2.1-gemma3-4band aligning backend fallback/default model handling, but VRAM/runtime management tasks remain open. - US3 and cross-cutting docs were updated to reduce stale guidance without claiming full ADR convergence.
- US1 sandbox OCR engine selection was implemented via
Phase 1: Setup (Shared Infrastructure)
Purpose: Project initialization and basic structure
- T001 Pull Typhoon OCR-3B model on Admin Desktop via
ollama pull scb10x/typhoon-ocr-3b - T002 Pull Typhoon2.1-gemma3-4b model on Admin Desktop via
ollama pull scb10x/typhoon2.1-gemma3-4b - T003 Verify both models are available via
ollama list
Phase 2: Foundational (Blocking Prerequisites)
Purpose: Core infrastructure that MUST be complete before ANY user story can be implemented
⚠️ CRITICAL: No user story work can begin until this phase is complete
- T004 Create SQL delta to extend ai_audit_logs table with modelType, vramUsageMB, cacheHit fields in specs/03-Data-and-Storage/deltas/2026-05-30-extend-ai-audit-logs.sql
- T004 Create SQL delta to extend ai_audit_logs table with modelType, vramUsageMB, cacheHit fields in specs/03-Data-and-Storage/deltas/2026-05-30-extend-ai-audit-logs.sql
- T005 Add Typhoon OCR prompt template to ai_prompts table via SQL delta in specs/03-Data-and-Storage/deltas/2026-05-30-add-typhoon-ocr-prompt.sql
- T006 [P] Implement VRAMMonitorService in backend/src/modules/ai/services/vram-monitor.service.ts to track GPU VRAM usage via Ollama API
- T007 [P] Implement OcrCacheService in backend/src/modules/ai/services/ocr-cache.service.ts for 24-hour Redis caching of OCR results
- T008 [P] Extend AiAuditLog entity in backend/src/modules/ai/entities/ai-audit-log.entity.ts with modelType, vramUsageMB, cacheHit fields
- T009 [P] Add Typhoon OCR integration function to OCR sidecar in specs/04-Infrastructure-OPS/04-00-docker-compose/Desk-5439/ocr-sidecar/app.py
- T009a [P] Update OCR sidecar Dockerfile for Typhoon OCR dependencies in specs/04-Infrastructure-OPS/04-00-docker-compose/Desk-5439/ocr-sidecar/Dockerfile
- T009b [P] Update OCR sidecar docker-compose.yml for Typhoon OCR environment variables in specs/04-Infrastructure-OPS/04-00-docker-compose/Desk-5439/ocr-sidecar/docker-compose.yml
- T009c [P] Add BullMQ Typhoon OCR processor in backend/src/modules/ai/processors/typhoon-ocr.processor.ts
- T009d [P] Add BullMQ Typhoon LLM processor in backend/src/modules/ai/processors/typhoon-llm.processor.ts
Checkpoint: Foundation ready - user story implementation can now begin in parallel
Phase 3: User Story 1 - Typhoon OCR Option in OCR Sandbox (Priority: P1) 🎯 MVP
Goal: Provide Typhoon OCR-7B as an alternative OCR engine in OCR Sandbox Runner with fallback to Tesseract
Independent Test: Select Typhoon OCR in OCR Sandbox Runner, process a Thai document, verify improved text extraction accuracy (95%+) and fallback to Tesseract when Ollama is unavailable
Implementation for User Story 1
- T010 [P] [US1] Create OcrEngineConfiguration entity in backend/src/modules/ai/entities/ocr-engine-configuration.entity.ts
- T011 [P] [US1] Create OcrEngineSelectionDto in backend/src/modules/ai/dto/ocr-engine-selection.dto.ts
- T012 [P] [US1] Create OcrEngineResponseDto in backend/src/modules/ai/dto/ocr-engine-response.dto.ts
- T013 [US1] Implement getOcrEngines() in backend/src/modules/ai/services/ocr.service.ts to list available OCR engines
- T014 [US1] Implement selectOcrEngine() in backend/src/modules/ai/services/ocr.service.ts with system.manage_all permission check
- T015 [US1] Implement processWithTyphoonOcr() in backend/src/modules/ai/services/ocr.service.ts with Ollama HTTP API integration
- T016 [US1] Implement fallbackToTesseract() in backend/src/modules/ai/services/ocr.service.ts with 5-second timeout
- T016a [US1] Add VRAM insufficiency handling in backend/src/modules/ai/services/ocr.service.ts to prevent loading when GPU VRAM < 4GB
- T017 [US1] Add GET /api/ocr-engines endpoint in backend/src/modules/ai/ai.controller.ts with CASL Guard
- T018 [US1] Add POST /api/ocr-engines/:engineId/select endpoint in backend/src/modules/ai/ai.controller.ts with CASL Guard
- T019 [US1] Create OcrEngineSelector component in frontend/src/features/ocr-sandbox/components/OcrEngineSelector.tsx (part of OCR Sandbox Runner)
- T020 [US1] Add Typhoon OCR option to OCR engine selector in frontend/src/features/ocr-sandbox/components/OcrEngineSelector.tsx (part of OCR Sandbox Runner)
- T021 [US1] Add i18n keys for Typhoon OCR in frontend/public/locales/th/ai.json
- T022 [US1] Integrate OcrCacheService in backend/src/modules/ai/services/ocr.service.ts for 24-hour caching
- T023 [US1] Add OCR processing log to ai_audit_logs per ADR-023/023A in backend/src/modules/ai/services/ocr.service.ts
Checkpoint: At this point, User Story 1 should be fully functional and testable independently
Phase 4: User Story 2 - Typhoon LLM in AI Model Management (Priority: P2)
Goal: Add typhoon2.1-gemma3-12b Q3_K_M as an option in AI Model Management with VRAM monitoring
Independent Test: Add typhoon2.1-gemma3-12b to AI Model Management, select it for document analysis, verify VRAM monitoring prevents concurrent model loading
Implementation for User Story 2
- T024 [P] [US2] Create AiModelConfiguration entity in backend/src/modules/ai/entities/ai-model-configuration.entity.ts
- T025 [P] [US2] Create AddAiModelDto in backend/src/modules/ai/dto/add-ai-model.dto.ts
- T026 [P] [US2] Create ActivateAiModelDto in backend/src/modules/ai/dto/activate-ai-model.dto.ts
- T027 [US2] Implement getAiModels() in backend/src/modules/ai/services/ai.service.ts to list available AI models
- T028 [US2] Implement addAiModel() in backend/src/modules/ai/services/ai.service.ts with system.manage_all permission check
- T029 [US2] Implement activateAiModel() in backend/src/modules/ai/services/ai.service.ts with VRAM validation
- T030 [US2] Integrate VRAMMonitorService in backend/src/modules/ai/services/ai.service.ts for model loading validation
- T031 [US2] Add GET /api/ai-models endpoint in backend/src/modules/ai/ai.controller.ts with CASL Guard
- T032 [US2] Add POST /api/ai-models endpoint in backend/src/modules/ai/ai.controller.ts with CASL Guard
- T033 [US2] Add PATCH /api/ai-models/:modelId/activate endpoint in backend/src/modules/ai/ai.controller.ts with CASL Guard
- T034 [US2] Add GET /api/ai/vram/status endpoint in backend/src/modules/ai/ai.controller.ts with CASL Guard
- T035 [US2] Add typhoon2.1-gemma3-4b option to ModelManagement component in frontend/src/features/ai-admin/components/ModelManagement.tsx
- T036 [US2] Add VRAM status display to AI admin page in frontend/src/app/(admin)/admin/ai/page.tsx
- T037 [US2] Add i18n keys for Typhoon LLM (typhoon2.1-gemma3-4b) in frontend/src/lib/i18n/locales/th.ts
- T038 [US2] Add AI model interaction logging to ai_audit_logs per ADR-023/023A in backend/src/modules/ai/services/ai.service.ts
Checkpoint: At this point, User Stories 1 AND 2 should both work independently
Phase 5: User Story 3 - ADR Conflict Resolution (Priority: P3)
Goal: Update ADR-023 and ADR-023A to document Typhoon models as supported on-premises AI options and create ADR-032
Independent Test: Review updated ADRs and verify they correctly document Typhoon model integration without conflicts
Implementation for User Story 3
- T039 [US3] Create ADR-032 for Typhoon OCR integration in specs/06-Decision-Records/ADR-032-typhoon-ocr-integration.md
- T040 [US3] Update ADR-023 to include Typhoon OCR and Typhoon LLM as supported AI options in specs/06-Decision-Records/ADR-023-unified-ai-architecture.md
- T041 [US3] Update ADR-023A to include Typhoon models as alternatives to gemma4/nomic-embed-text in specs/06-Decision-Records/ADR-023A-unified-ai-architecture.md
- T042 [US3] Review all ADRs for conflicts and ensure consistency in specs/06-Decision-Records/
Checkpoint: All user stories should now be independently functional
Phase 6: Polish & Cross-Cutting Concerns
Purpose: Improvements that affect multiple user stories
- T043 [P] Update quickstart.md with actual model pull commands and verification steps
- T044 [P] Add error handling for cache miss scenarios in backend/src/modules/ai/services/ocr-cache.service.ts
- T045 [P] Add error handling for model loading failures in backend/src/modules/ai/services/ai.service.ts
- T046 [P] Add user-friendly error messages with Thai i18n keys in frontend/src/lib/i18n/locales/th.ts
- T047 [P] Add error handling for VRAM insufficiency in backend/src/modules/ai/services/ai.service.ts
- T048 [P] Add error handling for Ollama service unavailability in backend/src/modules/ai/services/ocr.service.ts
- T049 Run quickstart.md validation on Admin Desktop
- T050 Update agent-memory.md with Typhoon OCR integration details
Dependencies & Execution Order
Phase Dependencies
- Setup (Phase 1): No dependencies - can start immediately
- Foundational (Phase 2): Depends on Setup completion - BLOCKS all user stories
- User Stories (Phase 3-5): All depend on Foundational phase completion
- User stories can then proceed in parallel (if staffed)
- Or sequentially in priority order (P1 → P2 → P3)
- Polish (Phase 6): Depends on all desired user stories being complete
User Story Dependencies
- User Story 1 (P1): Can start after Foundational (Phase 2) - No dependencies on other stories
- User Story 2 (P2): Can start after Foundational (Phase 2) - Uses VRAMMonitorService from Foundational phase
- User Story 3 (P3): Can start after Foundational (Phase 2) - No dependencies on other stories
Within Each User Story
- Models before services
- Services before endpoints
- Core implementation before integration
- Story complete before moving to next priority
Parallel Opportunities
- T001, T002, T003: Model pulls can run in parallel
- T006, T007, T008, T009, T009a, T009b, T009c, T009d: Foundational services can run in parallel
- T010, T011, T012: US1 DTOs/entities can run in parallel
- T024, T025, T026: US2 DTOs/entities can run in parallel
- T043, T044, T045, T046, T047, T048: Polish tasks can run in parallel
- Different user stories can be worked on in parallel by different team members
Parallel Example: User Story 1
# Launch all DTOs/entities for User Story 1 together:
Task: "Create OcrEngineConfiguration entity in backend/src/modules/ai/entities/ocr-engine-configuration.entity.ts"
Task: "Create OcrEngineSelectionDto in backend/src/modules/ai/dto/ocr-engine-selection.dto.ts"
Task: "Create OcrEngineResponseDto in backend/src/modules/ai/dto/ocr-engine-response.dto.ts"
Implementation Strategy
MVP First (User Story 1 Only)
- Complete Phase 1: Setup
- Complete Phase 2: Foundational (CRITICAL - blocks all stories)
- Complete Phase 3: User Story 1
- STOP and VALIDATE: Test User Story 1 independently
- Deploy/demo if ready
Incremental Delivery
- Complete Setup + Foundational → Foundation ready
- Add User Story 1 → Test independently → Deploy/Demo (MVP!)
- Add User Story 2 → Test independently → Deploy/Demo
- Add User Story 3 → Test independently → Deploy/Demo
- Each story adds value without breaking previous stories
Parallel Team Strategy
With multiple developers:
- Team completes Setup + Foundational together
- Once Foundational is done:
- Developer A: User Story 1
- Developer B: User Story 2
- Developer C: User Story 3
- Stories complete and integrate independently
Notes
- [P] tasks = different files, no dependencies
- [Story] label maps task to specific user story for traceability
- Each user story should be independently completable and testable
- Commit after each task or logical group
- Stop at any checkpoint to validate story independently
- Avoid: vague tasks, same file conflicts, cross-story dependencies that break independence